Free Web Hosting Provider - Web Hosting - E-commerce - High Speed Internet - Free Web Page
Search the Web

  03" Vertical Sniper project Pg.5 (under construction)
     
Home Page

About Page

What's New Page

03 Vertical Sniper project Pg1.

03" Vertical Sniper project Pg.2

03" Vertical Sniper Project Cont. pg3

03" Vertical Sniper Project Pg.4

03" Vertical Sniper project Pg.5 (under construction)

Auto Traccer Pg. 4(Under constuction)

Sterling Restoration Pg.1

Sterling Restoration Pg.2

Sterling restoration Pg. 3 (Under construction)

Paintball Art

Photo Page

Favorite Links

Contact Page

Guest Book Page

 
We have neared the end of this project

This probably the best stage of project.  Now it all comes together.  I'm sure by the time I get to final assembly I probably changed another item. That's just me. It really depends if I ran into a deal before everything got back from anodizing. I'll add notes if something has changed.

So we have the final color. Dust OD Olive drab. Barrel, body, back block and ASA. The quick change will be Dust Black.

 

NOTE:****

10 April 07

This part is delayed. I'm out of State working. Also the Anodizing did not come out perfect,so back it went.

Assembly time

Here we have everything layed out in order ready to go. I always start with valve insertion then go from there. Make sure you have all the proper tools.

Tools needed

Allen wrench set and singles, Valve tool, Cresent wrench and oil to lube all the parts before assembly.






 
   
 

1522